NTCMUD#5 Water Distribution Phase 2
Project Information

This project will connect the City’s water system to the Windermere Water System allowing the City to provide additional water supply to the NTCMUD #5 area. To improve pressure and overall water distribution, this project includes the installation of a new 16-inch water main along Black Locust Drive and Pflugerville Parkway; and pressure relief valve (PRVs) installations in the southern portion of town.

Project Engineer: Binkley & Barfield

Construction Contractor: Prota, Inc. - Austin

To view this project on the city's GIS Map, select Project 24.
 
 WP_20160318_13_47_31_Pro.jpg

Benefits

Benefits include:
  • Improved water transmission capacity and system reliability in the NTCMUD #5 area to better serve our water customers
  • Increased capacity for existing and proposed development 
  • Improved water pressure
  • Provides for a needed secondary water connections for overall water distribution

Project Schedule and Status
NTC MUD 2 1016.png
 The City Council awarded a construction contract to Prota, Inc. – Austin at the January 12, 2016 City Council meeting. City staff anticipate construction to be completed by Late 2016.