mapThe Capital Improvement Program (CIP) is responsible for the implementation of the City's Capital Improvement Plan. The CIP plan identifies needed capital improvement projects and establishes an implementation schedule and funding source for these projects. This plan is reviewed annually by City management, the Planning and Zoning Commission and City Council, to accommodate changes and adjustments to priorities.

The Capital Improvement Program staff is dedicated to providing Pflugerville citizens and the business community with quality, safe and efficient public infrastructure facilities for water, wastewater, transportation and drainage by ensuring compliance with the city’s adopted regulations and guidelines.


Projects Under Construction

Facilities

  • Animal Services Intake Facility
  • Public Works Operations and Maintenance Facility 

Streets and Drainage

Parks

Utility


Projects Under Design

Facilities

  • Justice Center Sewer Repairs 

Planning

  • Historic Colored Addition Area Study 
  • Public Works Facility Master Plan
  • Survey Control and Benchmark Network
  • Transportation Engineering Consultant Pre-Qualification
  • Transportation Master Plan
  • Water CCN Application Assistance
  • Water Master Plan 
  • Wastewater Master Plan
  • Water and Wastewater Impact Fee Update
  • Wilbarger Creek Drainage Study
  • Wastewater Plant Drainage Study

Streets and Drainage

Parks

Utility

  • Central Wastewater Treatment Plant Capacity Expansion to 10.0 MGD
  • SH 45 / SH 130 Water and Wastewater Line Extensions
  • Water Line Extension to Public Works Facility
  • West SH 130 Wastewater Interceptor Phase 1 & 2

Future Projects

Parks

  • Lake Pflugerville Improvements

Streets and Drainage (Not Funded)

Utility 
(Water and Wastewater Master Planning is currently underway and projects and priorities listed below may change)

  • Decommission Lift Station - Highland Park
  • Decommission Lift Station - Pfluger Lane
  • Downtown Pressure Zone Re-delineation
  • Lakeside Wastewater Interceptor Phase
  • New Sweden Wastewater Treatment Plan
  • New Sweden/Cottonwood Wastewater Interceptor Phase 1 & 2
  • Pecan Street Parkway Drive Interconnect
  • South Weiss Transmission Main from Wilbarger Creek to SH 130
  • Porchester Castle Path /Stone Hill Pressure Plane Interconnection
  • Well #6 Rehabilitation
  • Elevated Storage Tank for 800’ Pressure Plane
  • Oxford Transmission Main Extension
  • Wells Branch Loop Transmission Main Extension
  • Pump Station at Water Treatment Plant
  • River Intake Relocation 
  • Highland Park & Pfluger Lane Interceptor Upsize Phase 1 & 2

Completed Projects