Old Austin-Hutto Road

Print
Press Enter to show all options, press Tab go to next option

 Old Austin Hutto Open House Info

Project Information

This project includes roadway improvements for a 3-lane section of roadway along the full length of the project limits;and drainage improvements at the low water crossing to mitigate flooding of the roadway.

Old Austin Hutto Road is a connector street that runs adjacent to the Bohls Subdivision and to Heritage Park. The street has a low water crossing which frequently floods.

Project EngineerFreese & Nichols

Construction ContractorTBD

To view this project on the city's GIS Map

Benefits

Eliminate a low water crossing and improve the street with curb and gutter throughout the roadway.

Project Schedule and Status

This project is a part of the 2018 General Obligation bond, construction is slated to start in summer 2019.

 For More Information

Please contact the City of Pflugerville Capital Improvement Program at 512-990-6400 or by email at projects@pflugervilletx.gov if you have an additional questions.