NTCMUD#5 Water Distribution Phase 2

Print
Press Enter to show all options, press Tab go to next option

Project Information

This project will connect the City’s water system to the Windermere Water System allowing the City to provide additional water supply to the NTCMUD #5 area. To improve pressure and overall water distribution, this project includes the installation of a new 16-inch water main along Black Locust Drive and Pflugerville Parkway; and pressure relief valve (PRVs) installations in the southern portion of town.

Project Engineer: Binkley & Barfield

Construction Contractor: Prota, Inc. - Austin

To view this project on the city's GIS Map,

Benefits

Benefits include:
  • Improved water transmission capacity and system reliability in the NTCMUD #5 area to better serve our water customers
  • Increased capacity for existing and proposed development 
  • Improved water pressure
  • Provides for a needed secondary water connections for overall water distribution
0 DSCN1348
DSCN1349
WP_20160302_12_02_42_Pro
rsz_WP_20160509_14_20_38_Pro
WP_20160318_13_47_31_Pro
WP_20160409_14_12_08_Pro
WP_20160413_10_38_33_Pro
WP_20160413_10_41_19_Pro
WP_20160414_09_06_34_Pro
WP_20160419_10_34_11_Pro
WP_20160419_10_39_40_Pro
WP_20160419_11_03_05_Pro
WP_20160425_15_59_27_Pro
rsz_WP_20160511_07_45_14_Pro
WP_20160425_16_12_09_Pro
WP_20160425_16_12_24_Pro
WP_20160502_13_23_54_Pro
WP_20160502_13_24_27_Pro
rsz_WP_20160425_15_01_21_Pro
WP_20160502_13_24_51_Pro
WP_20160502_13_25_29_Pro
rsz_WP_20160504_15_04_28_Pro
WP_20160504_14_04_35_Pro
WP_20160505_11_35_33_Pro
WP_20160505_11_42_02_Pro
WP_20160509_13_51_37_Pro
rsz_WP_20160502_13_24_16_Pro
WP_20160509_13_52_48_Pro
WP_20160509_13_53_08_Pro
rsz_WP_20160509_14_20_54_Pro
WP_20160509_14_20_15_Pro
WP_20160511_07_26_46_Pro
rsz_WP_20160318_13_49_32_Pro
WP_20160511_07_45_02_Pro
WP_20160512_13_16_54_Pro
rsz_WP_20160504_15_04_37_Pro
WP_20160512_13_19_58_Pro
rsz_1wp_20160318_13_48_37_pro

Project Schedule and Status

The City Council awarded a construction contract to Prota, Inc. – Austin at the January 12, 2016 City Council meeting. Construction was completed in early 2017.